Before Destruction Bulkheads Beams 1 |
Roll Tank 1 Roll Tank 2 Roll Tank 3 |
Deck 2 Finish N Fit Gone Sailing |
![]() Jb2: The deck after receiving 2-3 coats of WEST epoxy to harden and strengthen the surface was sanded with 220 grit paper then given a couple of coats of polyurethane varnish that contained a UV filter. |
![]() JB4: The front end of the footwell. The hiking strap and mainsheet block are screwed into a strong point at the back of the well. The RWO inspection port is to allow ventilation throughout the tanks when not sailing. |
![]() |
![]() |
![]() |
![]() |