Make your own free website on Tripod.com
Roll Tank Deck System - Roll Tank 2
By:Joe Bousquet

Introduction
Before
Destruction
Bulkheads
Beams 1
Beams 2
Roll Tank 1
Roll Tank 2
Roll Tank 3
Deck 1
Deck 2
Finish N Fit
Gone Sailing

b34: The tank panel is first placed against the tank beams at the cockpit floor, then stapled and rolled onto the tank beams. Lots of micro balloons in the resin keep it from running out of the joints. JB12: The pre-cut and dry fitted tank panel is stapled to the bottom of the tank beams near the floor.
b35: The bottom edge is stapled, held in place and the panel is bent to the tankbeams. Expect lots of staples: one about every two inches.



Joe Bousquet - jbousquet@erols.com